This work requires an RBQ licence. It was carried out by companies holding the required licence and subcategories. Les Rénovations Floraz supervised the job site for the client: follow-up of the work, photos at every step and inspection of the finish.
Work carried out by an RBQ-licensed contractor chosen by Les Rénovations Floraz. You receive the contractor's name and licence number before work begins.
Before / after: slide to compare
Flat roof with a brick parapet. Before: the old, worn metal flashing, torn off and removed. After: the new black flashing covering the entire top of the parapet.
Drag the gold line left or right. Both photos show the same roof, taken from slightly different angles.
BeforeAfter
Roofing and flashing
Flat roof: old parapet flashing removed, then new metal flashing installed.
Before: worn parapet flashing torn off and removed from the flat roofAfter: new black metal flashing covering the top of the parapetFlat roof: flashing along the brick wall
Roof replacement and decking
Tear-off of old shingles, replacement of damaged decking, installation of the membrane and new shingles.
Fully finished roof: new shingles installed from end to endMembrane installed over the whole roof before the shinglesNew decking at the top of the slopeDecking replaced on a flat roofNew shingles installed
Attic insulation and decontamination
Removal of old contaminated insulation, attic cleaning, installation of ventilation baffles and new blown-in insulation.
Blowing new insulation into the atticDecontamination: industrial vacuum to remove the old insulationAttic insulated from end to endVentilation baffles installed before the insulationBlown-in insulation between the rafters
Hydro-Québec subsidy
Up to $1,500 for roof insulation and caulking
Hydro-Québec's LogisVert program offers $1,500 when you have your roof insulated and your home caulked. Both jobs must be done to qualify for the subsidy.
Single-family, semi-detached, row or mobile home, or cottage, heated mainly with electricity
Entire roof insulated to at least R-50 (RSI 8.8)
Caulking of windows, doors, attic hatch, range hood, fans, outlets and fireplace
Work done by a company holding the appropriate RBQ licence
Online application at logisvert.ca, no later than 9 months after the work, with paid invoices
How we help: we supervise the work done by the licensed company, take the photos and make sure you have all the invoices and information needed for your application.
The subsidy is granted by Hydro-Québec, not by Les Rénovations Floraz. Check the current conditions at logisvert.ca or 1 833 396-1888 before starting the work.
Door and window caulking
Every window in a house sealed before winter, from basement to upstairs.
Insulating foam around a new windowBasement window sealed to the concreteClean joint in the corner of the frameFoam under the sill, before finishing
Walls and windows
Walls opened to the framing, insulation panels installed and new windows sealed before finishing.
New window in an open wall, foam around the frameRigid insulation panels installed between the studsBasement: window sealed in the insulated wallBasement, seen from outside: foam all around the frameNew window installed, surround to finish before the trimBasement: new sliding window in its wood frame
Ceiling repairs
Holes and openings in the drywall patched, joints redone with compound, then ready for paint.
Hole in the drywall patched and covered with compoundJoint redone along the chimney flueOverall view of the garage ceiling after repairCeiling opened around a light fixture box, before finishingSmall hole in the ceiling, to patch and repaint
Doors
Old damaged frame removed, exterior door installed in its new frame, work area protected with tarps.
Removing the damaged wood at the bottom of the old frameExterior door installed, area protected with tarpsThe door seen from the entryway
Floors and baseboards: work in progress
Floating floor and baseboard installation, in progress. We'll add photos of the final result as soon as the job is finished.
In progress: light floor installed up to the stepBefore installation: subfloor cleared and preparedFloor cutter to cut planks on siteNew baseboard being installed, joint still to finishRoom corner: baseboards installed, finishing to come
A problem at home?
Call us or fill out the form, we'll get back to you quickly.